Parcel 011-060-03
Owners
F & H MINE SUPPLY, INC
P O BOX 747
WALLACE, ID 83873-0000
Parcel Summary
Location | 1140 CHUKKAR LN BATTLE MTN, NV 89820 |
---|---|
Use Code | 500: General Industrial - light industry, trucking and warehousing, service, repair, etc. |
Tax District | 8.0: Battle Mountain Road Special |
Zone | C2 |
Acreage | 2.3800 |
Plat Maps | 11-06.pdf (112kb) 11-06z.pdf (247kb) |
Map Documents | 99300 |
Additional Site Addresses
1142 CHUKKAR LN
BATTLE MTN, NV 89820
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $92,441 | $239,709 | $216,840 | $204,686 | $205,734 | $206,789 | $199,951 |
Total Extra Features Value | $154,573 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $5,900 | $5,900 | $5,900 | $5,900 | $5,900 | $5,900 | $5,900 |
Total Land Value | $40,460 | $40,460 | $38,594 | $38,594 | $38,594 | $38,594 | $38,594 |
Taxable Value | $293,374 | $286,069 | $261,334 | $249,180 | $250,229 | $251,283 | $244,446 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $102,681 | $100,124 | $91,467 | $87,213 | $87,580 | $87,949 | $85,556 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Instrument / Official Record | Date | Q/U | Type | V/I | Dcl Value | Ownership |
---|---|---|---|---|---|---|
193650 | 1995-06-05 | Q | Improved | $100,000 | Grantor: ST. GEORGE METALS, INC. Grantee: F & H MINE SUPPLY, INC. |
Buildings
Building # 1, Section # 1, WAREHOUSE, Distribution Warehouse
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
SHED113 | SMALL SHEDS (1 SIDE OPEN) RM 1-18 | 10 | 20 | 200.00 | $29.91 | 1989 | $5,982 | 46% | $2,752 | $2,752 |
PATCO1 | LOW COV #1-FGLSS #2-ALUM #3-WD #4-FABRIC | 8 | 50 | 400.00 | $9.73 | 1985 | $3,892 | 40% | $1,557 | $1,557 |
SEPTIC | SEPTIC SYSTEM (1,000 GALLON) RM 4-3 | 1.00 | $5,835.00 | 1980 | $5,835 | 33% | $1,896 | $1,896 | ||
THU | MH HOOKUP (WATER/SEWER/ELEC/GAS) RM 4-3 | 1.00 | $6,640.00 | 1990 | $6,640 | 48% | $3,154 | $3,154 | ||
WELL | DOMESTIC WELL/TANK/PUMP-(3/4 HP) RM 4-2 | 1.00 | $11,741.00 | 1990 | $11,741 | 48% | $5,577 | $5,577 | ||
SHOPS2 | SHOPS RM 1-14 | 30 | 40 | 1200.00 | $44.20 | 1997 | $53,042 | 58% | $30,765 | $30,765 |
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 855.00 | $5.28 | 1997 | $4,514 | 58% | $2,618 | $2,618 | ||
SHED 1A1 | SMALL SHEDS ALL SIDES WITH FLOOR RM 1-18 | 10 | 13 | 130.00 | $28.64 | 1990 | $3,723 | 48% | $1,768 | $1,768 |
DECK11 | WOOD DECK WITH STEPS (OPEN) MFG 15-21 | 8 | 12 | 96.00 | $29.39 | 2008 | $2,822 | 75% | $2,102 | $2,102 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2000 | $6,192 | 63% | $3,870 | $3,870 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2000 | $6,192 | 63% | $3,870 | $3,870 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2000 | $6,192 | 63% | $3,870 | $3,870 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2000 | $6,192 | 63% | $3,870 | $3,870 |
FNCCHL | CHAINLINK FENCE 1-3'2-4'3-5'4-6' RM 5-5 | 108.00 | $19.24 | 2008 | $2,078 | 75% | $1,548 | $1,548 | ||
EQSHD22 | EQUIPMENT SHED ONE SIDE OPEN RM 1-16 | 30 | 48 | 1440.00 | $22.79 | 2012 | $32,813 | 81% | $26,414 | $26,414 |
EQSHD22 | EQUIPMENT SHED ONE SIDE OPEN RM 1-16 | 30 | 48 | 1440.00 | $22.79 | 2012 | $32,813 | 81% | $26,414 | $26,414 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 40 | 320.00 | $38.70 | 2013 | $12,384 | 82% | $10,155 | $10,155 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2013 | $6,192 | 82% | $5,077 | $5,077 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2013 | $6,192 | 82% | $5,077 | $5,077 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 8 | 64.00 | $38.70 | 2013 | $2,477 | 82% | $2,031 | $2,031 |
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 480.00 | $6.50 | 2013 | $3,120 | 82% | $2,558 | $2,558 | ||
PATCO2 | AVG COV #1-FGLSS #2-ALUM #3-WD #4-FABRIC | 9 | 16 | 144.00 | $19.34 | 2013 | $2,785 | 82% | $2,284 | $2,284 |
CONWAL | CONCRETE WALL RM 5-3 | 2 | 30 | 60.00 | $30.01 | 2013 | $1,801 | 82% | $1,476 | $1,476 |
CONNEX1 | CONNEX BOX MVS 17-25 | 8 | 20 | 160.00 | $38.70 | 2000 | $6,192 | 63% | $3,870 | $3,870 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
EQ005275 | Unsecured | F & H MINE SUPPLY | EQ - EQUIPMENT |
MH008339 | Secured | F & H MINE SUPPLY, INC | MH - MOBILE HOMES |
Disclaimer
All parcel data on this page is for use by the Lander County Property Appraiser for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Lander County Assessor's Office as of April 27, 2025.