Parcel 005-000-02
Owners
UNITED STATES FOREST SERVICE
P O BOX 130
AUSTIN, NV 89310-0130
Parcel Summary
Location | NV |
---|---|
Use Code | 320: Three to Four Units |
Tax District | 6.0: Austin Road |
Acreage | .0000 |
Exemptions | 361.050A: US GOVERNMENT (NOT PUBLIC DOMAIN) (100%) |
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $568,128 | $780,614 | $740,620 | $676,600 | $680,069 | $683,554 | $660,949 |
Total Extra Features Value | $172,697 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Taxable Value | $740,825 | $780,614 | $740,620 | $676,600 | $680,069 | $683,554 | $660,949 |
Net Exemptions Value | $259,289 | $273,215 | $259,217 | $236,810 | $238,024 | $239,244 | $231,332 |
Net Assessed Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
None
Buildings
Building # 1, Section # 1, RESIDENCE, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1281 | $239,568 | 1985 | 1985 | 0.00% | 60.00% | 40.00% | $95,827 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0304 | Electric Baseboard |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 6.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0701 | Attached Garage | 583.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0801 | Total Basement Area (SF) | 1281.00 | |
SFA | # Single-Family Attached Units | 6.00 |
Building # 2, Section # 1, RESIDENCE, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1281 | $242,847 | 1985 | 1985 | 0.00% | 60.00% | 40.00% | $97,139 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0214 | Metal, Preformed |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 6.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0701 | Attached Garage | 583.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0801 | Total Basement Area (SF) | 1281.00 |
Building # 3, Section # 1, DUPLEX, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1752 | $242,361 | 1985 | 1985 | 0.00% | 60.00% | 40.00% | $96,944 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0214 | Metal, Preformed |
EW | EXT WALL | 0103 | Frame, Plywood |
HEAT | HEAT | 0304 | Electric Baseboard |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0701 | Attached Garage | 681.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 4, Section # 1, DUPLEX, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1730 | $213,805 | 1985 | 1985 | 0.00% | 60.00% | 40.00% | $85,522 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0304 | Electric Baseboard |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 5, Section # 1, DUPLEX, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1730 | $213,805 | 1985 | 1985 | 0.00% | 60.00% | 40.00% | $85,522 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0304 | Electric Baseboard |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 6, Section # 1, BUILDING, Office Building
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
BUNK2 | BUNK HOUSES RM 3-3 | 313.00 | $46.26 | 1985 | $14,479 | 40% | $5,792 | $5,792 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 1022.00 | $5.28 | 1985 | $5,396 | 40% | $2,158 | $2,158 | ||
ASPHALT | ASPAHLT PAVING (1-2" 2-4")M/S C-5 & C-12 | 14372.00 | $4.23 | 1985 | $60,794 | 40% | $24,317 | $24,317 | ||
CORALT | T-POSTS & BARBED-WIRE RM 5-3 | 6366.00 | $2.49 | 1985 | $15,851 | 40% | $6,341 | $6,341 | ||
HC | Manually Costed | 2.00 | $5,992.00 | 1985 | $11,984 | 40% | $4,794 | $4,794 | ||
HC | Manually Costed | 4 | 16 | 64.00 | $24.38 | 1985 | $1,560 | 40% | $624 | $624 |
HC | Manually Costed | 1.00 | $3,625.00 | 1985 | $3,625 | 40% | $1,450 | $1,450 | ||
SHOPS2 | SHOPS RM 1-14 | 3247.00 | $35.62 | 1985 | $115,649 | 40% | $46,260 | $46,260 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 2182.00 | $6.50 | 1985 | $14,183 | 40% | $5,673 | $5,673 | ||
FNCCHL | CHAINLINK FENCE 1-3'2-4'3-5'4-6' RM 5-5 | 1480.00 | $22.18 | 1985 | $32,826 | 40% | $13,131 | $13,131 | ||
SHED 11 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 10 | 12 | 120.00 | $23.77 | 1985 | $2,852 | 40% | $1,141 | $1,141 |
M-GATE | METAL GATES (PORTABLE PANELS) RM 5-5 | 420.00 | $11.55 | 1985 | $4,851 | 40% | $1,940 | $1,940 | ||
HC | Manually Costed | 1560.00 | $17.31 | 1985 | $27,004 | 40% | $10,801 | $10,801 | ||
MHELEC | MOBILE HOME (ELECTRIC HOOKUP)AVG RM 4-3 | 2.00 | $2,444.00 | 1985 | $4,888 | 40% | $1,955 | $1,955 | ||
SHED 13 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 64.00 | $51.40 | 1985 | $3,290 | 40% | $1,316 | $1,316 | ||
SHED 13 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 44.00 | $58.05 | 1985 | $2,554 | 40% | $1,022 | $1,022 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 683.00 | $5.28 | 1985 | $3,606 | 40% | $1,442 | $1,442 | ||
FNCWD1 | WOOD FENCE-SOLID,1-3',2-4',3-5',4-6' | 128.00 | $32.07 | 1985 | $4,105 | 40% | $1,642 | $1,642 | ||
SHED 12 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 8 | 10 | 80.00 | $37.20 | 1985 | $2,976 | 40% | $1,190 | $1,190 |
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 683.00 | $5.28 | 1987 | $3,606 | 43% | $1,551 | $1,551 | ||
PATCO1 | LOW COV #1-FGLSS #2-ALUM #3-WD #4-FABRIC | 6 | 5 | 30.00 | $16.07 | 1985 | $482 | 40% | $193 | $193 |
FNCWD1 | WOOD FENCE-SOLID,1-3',2-4',3-5',4-6' | 186.00 | $32.07 | 1985 | $5,965 | 40% | $2,386 | $2,386 | ||
PATCO1 | LOW COV #1-FGLSS #2-ALUM #3-WD #4-FABRIC | 56.00 | $21.65 | 1985 | $1,212 | 40% | $485 | $485 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 644.00 | $5.28 | 1985 | $3,400 | 40% | $1,360 | $1,360 | ||
FNCWD1 | WOOD FENCE-SOLID,1-3',2-4',3-5',4-6' | 339.00 | $35.31 | 1985 | $11,970 | 40% | $4,788 | $4,788 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 1028.00 | $5.28 | 1985 | $5,428 | 40% | $2,171 | $2,171 | ||
FNCWD1 | WOOD FENCE-SOLID,1-3',2-4',3-5',4-6' | 406.00 | $35.31 | 1985 | $14,336 | 40% | $5,734 | $5,734 | ||
SHED 11 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 160.00 | $22.14 | 1985 | $3,542 | 40% | $1,417 | $1,417 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 852.00 | $5.28 | 1985 | $4,499 | 40% | $1,799 | $1,799 | ||
FNCWD1 | WOOD FENCE-SOLID,1-3',2-4',3-5',4-6' | 130.00 | $32.07 | 1985 | $4,169 | 40% | $1,668 | $1,668 | ||
SHED 11 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 160.00 | $22.14 | 1985 | $3,542 | 40% | $1,417 | $1,417 | ||
COFTWK | CONCRETE FLAT WORK (2)+MESH RM+MVS 66-2 | 4 | 5 | 20.00 | $5.28 | 1985 | $106 | 40% | $42 | $42 |
SHED 11 | SMALL SHEDS ALL SIDES CLOSED RM 1-18 | 160.00 | $22.14 | 1985 | $3,542 | 40% | $1,417 | $1,417 | ||
THU | MH HOOKUP (WATER/SEWER/ELEC/GAS) RM 4-3 | 5.00 | $6,640.00 | 1985 | $33,200 | 40% | $13,280 | $13,280 |
Land Lines
None
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
MH002418 | Unsecured | US FOREST SERVICE | MH - MOBILE HOMES |
Disclaimer
All parcel data on this page is for use by the Lander County Property Appraiser for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Lander County Assessor's Office as of April 25, 2025.